
Metal Works
Selly Oak, Birmingham
Sector:Residential
Project:436 bed scheme, 4-8 storeys
Client:VHL
Value:£16.9 million
Role:Consulting Engineers
Description:The design and construction of 436 student study bedrooms in cluster flats / studios built in blocks 4-8 storeys high built in steel framed construction.